Bathroom Remodeling

The bathroom
that matches
the exterior.

Dallas offers full bathroom remodeling as an add-on to exterior projects. The same attention to detail he brings to stucco and exterior systems applies inside β€” waterproofing done correctly, tile set properly, no shortcuts that come back as leaks and mold. Most bathroom remodels happen alongside a full exterior project when the home is already being transformed.

Full
Gut to finish
Tile
Custom tile work
1yr
Workmanship warranty
0
Subcontractors
πŸ“ž (801) 518-5030 β€” Dallas Direct Utah Lic. #14405471-5501 Β· Licensed Β· Bonded Β· Insured
Best Combined With Exterior Projects
Bathroom remodeling is most cost-effective when done alongside a full exterior project. Dallas is already on site, his crew is already there, and the coordination saves both time and money. Ask about combining bathroom remodeling with your exterior project for the best value.
What We Remodel

Full gut to finish.
Every element.

Dallas performs complete bathroom renovations β€” from removing the existing bathroom down to the studs through full finish including tile, fixtures, vanity, and paint. The same forensic approach he applies to exterior water damage applies to bathroom waterproofing.

🚿

Shower and Tub Surrounds

Full demolition and rebuild. Correct waterproofing membrane β€” not just cement board. Custom tile. Niche shelving. Linear or traditional drain. Built to last decades.

πŸͺŸ

Flooring

Heated floor systems, large format tile, luxury vinyl plank. Correct substrate preparation. Uncoupling membrane for crack prevention. Proper slope to drain.

🚰

Vanity and Plumbing

Custom or semi-custom vanity installation. Plumbing rough-in coordination. New faucets, mirrors, and lighting. All plumbing connections professionally installed.

🏠

Full Gut Remodel

Complete demolition to studs. Inspect for hidden moisture or mold. Rebuild correctly from the framing out. No cosmetic overlays over bad substrate.

πŸ’‘

Lighting and Electrical

Recessed shower lighting, vanity lighting, exhaust fan replacement. All electrical work coordinated with licensed electrician. Permits pulled for all electrical scope.

🎨

Paint and Finish

Moisture-resistant paint on all surfaces. Color consultation available. Trim, door, and accessory installation. Complete finish before project is signed off.

Why Dallas Does Bathrooms Right

Waterproofing
done correctly.

The most common bathroom remodel failure is waterproofing. Cement board alone is not a waterproofing membrane. Most tile contractors apply cement board and tile directly β€” no membrane, no slope engineering, no proper drain integration. Dallas treats bathroom waterproofing the same way he treats exterior moisture barriers β€” correctly.

  • β—†
    Schluter or RedGard waterproofing membrane β€” applied to all shower surfaces before tile. The only correct way to waterproof a shower.
  • β—†
    Schluter Kerdi or Wedi board substrate β€” waterproof substrate in wet areas. Not just cement board.
  • β—†
    Correct floor slope to drain β€” floor pitched correctly in all directions. No standing water.
  • β—†
    Hidden moisture inspection before rebuilding β€” if existing bathroom has hidden moisture damage Dallas finds it before tiling over it.
Bathroom remodel Utah
Bathroom Remodel
Full Gut Remodel β€” Sandy UT
Complete demolition to studs. Schluter waterproofing system throughout. Large format tile. Heated floor. New vanity and fixtures.
Recent Bathroom Projects

Real bathrooms.
Real results.

Every bathroom below was remodeled by Dallas personally. Correct waterproofing. Custom tile. No shortcuts.

Walk-in shower remodel Utah
Walk-In Shower Remodel
Full gut to studs. Schluter Kerdi waterproofing. Large format 24x48 tile. Linear drain. Built-in niche. Frameless glass door.
πŸ“ Sandy, UT
Full bathroom remodel Utah
Full Bathroom Transformation
Complete gut remodel. New vanity, heated tile floor, custom shower surround, new lighting and fixtures throughout.
πŸ“ Holladay, UT
Master bathroom remodel Utah
Master Bathroom Remodel
Double vanity, freestanding soaking tub, custom tile shower surround, heated floors. Full gut remodel completed in 3 weeks.
πŸ“ Cottonwood Heights, UT
The Remodel Process

Gut it right.
Build it right.

Most bathroom remodel failures happen at the waterproofing stage β€” not the tile stage. Dallas applies the same forensic precision to bathroom moisture protection that he applies to exterior stucco systems. Water gets out. Not in.

The Hidden Moisture Check

Before rebuilding Dallas inspects the existing substrate for hidden moisture damage. Failed shower waterproofing is one of the most common causes of hidden wall and floor damage in Utah homes. He finds it before tiling over it β€” not 2 years later when the mold shows up.

1
Design consultation and selection
Tile selection, fixture selection, layout planning. Dallas walks you through options and helps you make decisions before demo starts β€” not during construction.
2
Full demolition
Everything removed to studs. Hidden moisture or mold documented and shown to customer before proceeding. No rebuilding over existing damage.
3
Rough-in plumbing and electrical
Plumbing relocated or extended as needed. Electrical updated for new lighting and heated floor. All permits pulled. Inspections passed.
4
Waterproofing system
Schluter or RedGard waterproofing membrane applied to all wet surfaces. Schluter Kerdi or Wedi board in shower. Uncoupling membrane on floor. The step most bathroom contractors skip.
5
Tile installation
Tile set with full coverage thinset β€” no spot bonding. Correct grout joint spacing. Grout sealed after cure. All transitions finished with Schluter trim profiles.
6
Fixtures and finish
Vanity, mirrors, lighting, plumbing fixtures, glass door, accessories β€” all installed. Complete walkthrough before project is signed off.
Frequently Asked Questions

Bathroom remodeling
answered.

The questions Utah homeowners ask before committing to a bathroom remodel.

How much does a bathroom remodel cost in Utah?
A full gut bathroom remodel in Utah typically runs $15,000 to $35,000 for a standard master bath depending on tile selection, fixture quality, and scope. Walk-in shower only remodels run $8,000 to $18,000. Dallas provides a written itemized estimate β€” call (801) 518-5030.
How long does a bathroom remodel take?
A complete gut bathroom remodel takes 2 to 4 weeks from demo to final finish. The longest phases are waterproofing cure time and tile setting β€” these cannot be rushed. Dallas does not rush cure times. He provides a realistic week-by-week schedule with every written estimate.
Can I use my other bathroom during the remodel?
Yes β€” Dallas remodels one bathroom at a time so you always have a functioning bathroom during the project. He does not take on projects that leave a household without any bathroom access.
Why is Schluter waterproofing better than cement board alone?
Cement board is not waterproof β€” it is moisture resistant. Water that gets through grout joints or around fixtures will eventually reach cement board and the framing behind it. Schluter Kerdi membrane is a true waterproofing layer that stops water at the surface. Dallas installs it on every shower and tub surround because it is the correct way to waterproof a wet area β€” not a cost-saving shortcut.
Is bathroom remodeling better done with exterior work?
Yes β€” and Dallas offers a discount when bathroom remodeling is combined with an exterior project. His crew is already on site, coordination is simpler, and the overall project timeline is shorter than doing them separately. Ask about combined project pricing when you call.
Get Your Bathroom Estimate

Waterproofed right.
Tiled right.
Warranted.

Correct waterproofing. Custom tile. Dallas personally on every bathroom project.

Or call: (801) 518-5030 Β· Dallas answers personally Β· Mon–Sat

Schluter
Waterproofing
Full
Gut remodel
1yr
Workmanship
0
Subcontractors
Call Now

Call Now